Matters needing attention in installation of aluminum honeycomb curtain wall
時間:2024-07-18 閱讀: 4368
The installation process of the aluminum honeycomb curtain wall aluminum veneer is: measuring the flow rate-anchoring the bracket point-force frame installation-panel and component assembly-sealant filling-removing the protective film and cleaning the glass surface curtain wall. During the installation process, please pay attention to the following issues.

1 The measured value should match the measured value of the main structure, and the horizontal elevation should be drawn from the ground layer by layer to avoid accumulation of errors. When measuring, the wind should not exceed four levels. The ink line should pop out along the outside of the floor, or the piano line should be used to determine the plane datum line of the curtain wall. Starting from the reference line, the relative distance is the plane of the curtain wall, and the front and back positions of the columns are determined based on this line, thereby determining the position of the entire curtain wall.

2 Columns are usually vertical members and are one of the keys to installing curtain walls. Its accuracy and quality will affect the installation quality of the entire curtain wall. The allowable deviation between the plane axis of the combined curtain wall and the outer plane axis of the building should be controlled within 2mm, especially for curved, flat, round, and enclosed curtain walls. The distance between the inner axis and the outer axis will affect the perimeter of the curtain wall. It should be taken seriously.

3 The column can be one-storey high or two-storey high. The whole is one, and the length can reach 7.5m. There should be a certain gap at the joint, not less than 10mm, using the sleeve connection method. If the connection between the connecting piece and the embedded part is two layers or a whole, in order to improve the rigidity of the curtain wall frame, the connection point between the column and the main structure can be appropriately increased. With hinge and rigid joint structure, the hinge can only resist horizontal force. When the joint position is a brick structure, the joint cannot be used with expansion bolts, but should be fixed by wall bolts. The vertical force is transmitted to the main structure.

4 The beam is usually a horizontal member, which is a section embedded in the column, and the connecting members at both ends of the beam are installed at the predetermined position of the column. The beam is placed on the connecting piece, not fixed, and the length of the blanking is intentionally shortened during the production process, so that there is a certain gap at the joint. Because the columns are connected by sleeves, there are gaps at the joints, and there are also gaps between the beams and the columns. Therefore, the columns and beams can be installed to form a frame with a certain deformability to adapt and deform. Eliminate building deformation and temperature deformation. Improving the impact of its carrying capacity. However, if the curved shape of the beam is a broken line or a chamfer, the beam and connectors should be fixed to prevent the beam from falling. The frame of aluminum honeycomb curtain wall aluminum veneer should use aluminum profile with anodized surface, and steel cannot be used. If the frame and the wall plate are two kinds of metals, the electrode potential difference is likely to occur, and the aluminum plate is corroded. Do not use ordinary screws. Each vertical material of the frame system should be firmly connected with the embedded iron parts of the main structure, and the horizontal and vertical materials should be fixed with stainless steel bolts to ensure the durability of the installation.

5 In addition to the decorative effect of the facade, the joint width of the aluminum honeycomb curtain wall and aluminum veneer should also be considered, and the thermal expansion after thermal expansion should be considered. The joints must be sealed with weather-resistant rubber caulking materials to prevent gas penetration and rainwater leakage. Please note that when caulking and weathering glue:

1 Fully clean the gap between the aluminum veneers of the aluminum honeycomb curtain wall to ensure that the bonding surface is clean and dry.

2 To adjust the depth of the seam, avoid the three sides of the glue, and then fill the seam with PVC foam material (small round rod).

3 After applying the glue, the surface of the glue should be smoothed to remove the excess glue.

4 Pay attention to maintenance after injection, and do not get dust and scratches before the glue is completely cured.

聯(lián)系我們
Shenzhen Zhongda Aluminum Products Decoration Co., Ltd.
Telephon:86-755-23499577 
Fax:86-755-23499552 
Zheng Ge:13510710905
Zheng Junji:13640954348
Mailbox:szzdpd@163.com 
Address: 1st Floor, Building B, No. 3, Minying Road, Shilong Community, Shiyan Street, Baoan District, Shenzhen
Website:http://www.xhswny.cn

掃一掃 更多精彩
幕墻鋁單板廠家,氟碳噴涂鋁單板定做安裝,平面鋁單板建材訂購,單層鋁單板批發(fā)價格
版權(quán)所有:深圳市眾達鋁制品裝飾有限公司    粵ICP備14077854號
主站蜘蛛池模板: 日韩精品专区在线影院重磅| 国产乱人伦偷精品视频免下载 | 国产精品你懂的在线播放| 人人爽人人爽人人片av| 大学生疯狂高潮呻吟免费视频| 国产精品一区二区久久| 99re6在线视频精品免费| 乱色精品无码一区二区国产盗| 亚洲av综合av国产av中山| 亚洲人成影院在线无码按摩店| 日韩一区二区三区射精-百度| 国产偷v国产偷v亚洲高清| 国产情侣久久久久aⅴ免费| 亚洲色无码国产精品网站可下载| 亚洲人成绝费网站色www| 高级会所人妻互换94部分| 不卡av电影在线| 影音先锋无码aⅴ男人资源站 | 国产免费内射又粗又爽密桃视频| 中文在线最新版天堂| 亚洲成av人的天堂在线观看| 亚洲欧洲无码av电影在线观看| 无码人妻久久一区二区三区| 国产精品亚洲二区在线观看| 337p日本欧洲亚洲大胆精品| 成人免费a级毛片无码网站入口| 无码av大香线蕉伊人久久| 国产国语熟妇视频在线观看| 我爱我色成人网| 欧美另类人妻制服丝袜 | 快好爽射给我视频| 无码人妻一区二区三区免费视频| 国产成a人亚洲精品无码久久网| 日本乱偷人妻中文字幕| 国精产品999一区二区三区有限| 大屁股肥熟女流白浆| 日韩一区二区三区无码人妻视频| 粉色午夜视频| 激情综合色综合啪啪五月丁香搜索| 国产激情艳情在线看视频| 亚洲性色av私人影院无码|